Quick Menu
Guidelines to Bidders
for E-Tendering

Phase II Views
Policies2012
S.No. Subject POLICY No. DOWNLOAD
1. POLICY LETTERS FOR SPECIFICATIONS: MAP PHASE-III" 01/2012
2. SPECIFICATIONS: FUTURE PROJECTS OF MAP PHASE-II AND PHASE-III 02/2012
3. SPECIFICATIONS FOR FUTURE PROJECTS OF MAP PHASE-II & PHASE-III
MINIATURE CIRCUIT BREAKERS
03/2012
4. SPECIFICATIONS FOR FUTURE PROJECTS OF MAP PHASE-II & PHASE-III
STEEL WINDOWS / VENTS (FOR SERVANT QUARTER ONLY)
04/2012
  SPECIFICATIONS: PAINTING TO MILD STEEL SURFACES (FOR COASTAL AREAS ONLY) 04/2012
5. SPECIFICATIONS: PAINTING TO MILD STEEL SURFACES 05/2012
6. SPECIFICATIONS: MODULAR SWITCHES 06/2012
7. SPECIFICATIONS: ANTIFUNGAL PAINT (EXTERNAL SURFACES IN
COASTAL AREAS FOR ALL DUs)
07/2012
8. SPECIFICATIONS: THREE PHASE ENERGY METERS 08/2012
9. SPECIFICATIONS: GLAZING 9/2012
10. SPECIFICATIONS: BUILDERS HARDWARE FITTINGS 10/2012
11. SPECIFICATIONS: MCB DISTRIBUTION BOARD INSIDE DWELLING UNI T 11/2012
12. SPECIFICATIONS: EXHAUST FANS 300 mm 6 POLE S 12/2012
13. SPECIFICATIONS: ANTI-TERMITE TREATMENT TO FOUNDATIONS
AND GROUND FLOOR
13/2012
14. SPECIFICATIONS: FLUSH DOOR SHUTTERS 14/2012
15. SPECIFICATIONS: CEMENT 15/2012
16. SPECIFICATIONS: SINGLE PHASE ENERGY METER 16/2012
17. SPECIFICATIONS: CEILING FANS 17/2012
18. SPECIFICATIONS: ELECTRIC WATER HEATER CAPACITY 25 LITRES (GEYSERS) 18/2012
19. SPECIFICATIONS: CAST IRON/ MILD STEEL BOXES 19/2012
20. SPECIFICATIONS: CEILING ROSES 20/2012
21. SPECIFICATIONS: HDPE WATER STORAGE TANKS 21/2012
22. SPECIFICATIONS: SOIL WASTE AND VENT PIPES 22/2012
23. SPECIFICATIONS: BUS TRUNKING SYSTEM (BUSBAR) 23/2012
24. SPECIFICATIONS: FIRST AID HOSE REEL (FIRE FIGHTING) 24/2012
25. SPECIFICATIONS: PRESSED STEEL CHOWKATS FOR DOORS 25/2012
26. SPECIFICATIONS: VALVES (FIRE FIGHTING) 26/2012
27. SPECIFICATIONS: PRESSURE GAUGE (FIRE FIGHTING) 27/2012
28. SPECIFICATIONS: PIPING (FIRE FIGHTING) 28/2012
29. SPECIFICATIONS: EXTERNAL HOSE CABINETS (FIRE FIGHTING) 29/2012
30. SPECIFICATIONS: OIL BOUND DISTEMPER 30/2012
31. SPECIFICATIONS: STEEL AND IRON WORK 31/2012
  STEEL SUPPLY & ACCEPTANCE REGISTER  
  AMENDMENT:STEEL AND IRON WORK  
  AMENDMENT:STEEL AND IRON WORK  
32. SPECIFICATIONS: FRP FRAMES AND FRP PANEL DOORS FOR TOILETS & BATHROOMS 32/2012
33. SWITCHES 33/2012
34. SPECIFICATIONS: GAUZED SHUTTER 34/2012
35. SPECIFICATIONS: KITCHEN SINK, DRAINAGE BOARD AND PLATE RACK
1.
35/2012
36. SPECIFICATIONS: WHITE/COLOUR WASHING 36/2012
37. PAVER BLOCKS 37/2012
38. SOP FOR APPROVAL OF VENDORS 38/2012
39. SOP FOR SELECTION OF DEPMCs FOR MAP PHASE-III 39/2012
40. SPECIFICATIONS: COLLECTION (SOLAR HEATING SYSTEM) 40/2012
41. SPECIFICATIONS: ABSORBER SOLAR HEATING SYSTEM 41/2012
42. SPECIFICATIONS: LUMINARIES (LF1, LF2 & LF3) 42/2012
43. SPECIFICATIONS: SANITARY FITTINGS 42/2012
44. MANDATORY ELECTRICAL TESTS FOR ELECTRIC WIRING & FITTINGS FOR
FUTURE PROJECTS OF MAP PH-II & PH-III
44/2012